Games Area

The Games Area which used to comprise two basic basketball courts has been redesigned to accommodate a far improved facility for the students. 

The Games Area is currently under construction and is located between the Gymnasium and the new Warren Integrated Studies HUB. It is due to be opened along with the HUB, the Mathematics Rooms and the Visual Arts Studios on Friday 19 August 2022.

The games area is a typical concrete construction with acrylic coating with an inlaid NBL approved cassette system playing surface for the formal court area. The courts will be marked with Basketball, Netball and Futsal. There is a running track that surrounds the court area as well as a 'target wall' for PDHPE lessons and lunchtime games. The area is landscaped to provide shade where possible.

Construction images

Construction images